Beam deflection jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
    Job State
    1,704 beam deflection jobs found, pricing in JMD
    Trophy icon I need a LOGO fast! 20h left

    ...a new product called: Tractor Beam Targeting. It's a brand new technology that targets people on their mobile phones & shows them Ads based on locations they visit. I named it Tractor Beam Targeting because it's designed to pull people into my customer's locations from their competitors. Just a like a tractor beam would pull someone into a spaceship

    $10057 (Avg Bid)
    Featured Guaranteed
    $10057 Avg Bid
    64 entries

    help in writing Lab reports , 3 experience on ( Heat Treatment and Visual Inspection with dye Penetrants and Beam Deflection Experiment ).i need it asap....

    $2514 (Avg Bid)
    $2514 Avg Bid
    6 bids

    I need to help writing Lab reports , I have done three experiences on ( Heat Treatment and Visual Inspection with dye Penetrants and Beam Deflection Experiment ).

    $13702 (Avg Bid)
    $13702 Avg Bid
    6 bids

    ...amplify the signal from the Wheatstone bridge output. The data then will be read in an Arduino. Project description: 1). I have a blade that I installed in a cantilever beam position. 2). I will install the strain gauges on the blade. (Half-bridge Wheatstone bridge). 3). Once the blade bends downwards or upwards, it will give us a positive and

    $3143 (Avg Bid)
    $3143 Avg Bid
    4 bids

    Design machinery to process structural steel beam sections using automation and robotics and design automated cleaning tables for CNC Plasma Cutting

    $2175 / hr (Avg Bid)
    $2175 / hr Avg Bid
    32 bids

    ... Milestone 3: Construction Drawing (Structural) 1 week (due 29 December) Payment 6,000 30% (25% + 5% on time completion) [url removed, login to view] Plan [url removed, login to view] Plan [url removed, login to view] beam plan [url removed, login to view] plan (structural) [url removed, login to view] details [url removed, login to view] spec Milestone 4: Constructi...

    $18184 (Avg Bid)
    $18184 Avg Bid
    3 bids

    I'm facing convergence issues with Abaqus for a fire study. Please ping me for more details. Thanks

    $2539 (Avg Bid)
    $2539 Avg Bid
    1 bids

    ...Efficiency - er - Antenna Reflection Efficiency - eo - Total Antenna Efficiency - Pin - Radiated Power - G - Gain of the antenna - Aem - Maximum Effective Area - A - Beam Solid Angle - HPBW - Half Power Beamwidth (in degrees) - FNBW - Full Null Beamwidth (in degrees) For the given parameters of : - Current Distribution - Program should

    $17473 (Avg Bid)
    $17473 Avg Bid
    12 bids

    Hi I need a structural engineer to calculate: 1) Ridge Beam size 2) Suspended steel Sizes 3) Floor joist sizes as per drawings for the two property plans attached. There will be some minor refinements. I will provide the drawings in PDF to be amended and the various steel and joists to be identified as per drawings All instructions

    $29541 (Avg Bid)
    $29541 Avg Bid
    30 bids

    ...In compression e. Load Vs Strain (Concrete) in graphs f. Load Vs Strain (Reinforcement Bars) in graphs g. Load Vs Strain ( Reinforcement Spirals) in graphs h. Load Vs Deflection/Displacement 5. Send the soft copies 6. A Complete video tutorial of a specimen 7. match with experimental results [url removed, login to view]

    $19359 (Avg Bid)
    $19359 Avg Bid
    6 bids

    i need to design and che...limited to the following 1-wind load calculations and check 2-calculate ribs thickness and ribs quantity 3-ribs including foam or solid 4-calculating moment 5-check deflection 6-check handling stress 7-check panel thickness 8-fixation design support angle with option that i choose different angles 9- safety checks

    $16342 (Avg Bid)
    $16342 Avg Bid
    5 bids

    ...transmitter power of zero makes an antenna inactive, resulting in a computed power density of zero. The operating frequency (MHz), power (W), antenna gain (dBi), location and beam-width (sector) information must be specified for each antenna. The MPE limit is computed and displayed in cell D4-I4 according to the frequencies specified in cell D3-I3.

    $3143 / hr (Avg Bid)
    $3143 / hr Avg Bid
    1 bids

    Detail 1 curved steel beam with cleats for fabrication. Plan attached - Site measurements of existing attached NEEDS TO BE COMPLETED ASAP

    $13325 (Avg Bid)
    $13325 Avg Bid
    7 bids

    We have 1 curved steel beam which needs to be detailed for fabricators TODAY.

    $15702 (Avg Bid)
    $15702 Avg Bid
    6 bids

    ...did the initial section drawings - I then sent these drawings to an engineer to get the column and beams designed up. I would like all the sections updated to reflect the new beam, and pillar design. Please see attached dwg file. Note that the dwg file is not the updated one - I am waiting to get the dwg file from the structural engineer and we will use

    $16415 (Avg Bid)
    $16415 Avg Bid
    50 bids

    One 32 foot lonf I-Beam has been installed in a location. Need a writtenn certification for the I-beam.

    $15211 (Avg Bid)
    $15211 Avg Bid
    9 bids

    The task is to create an Exce...cover the following connection methods: - endplate (shear only) - finplate (shear only) - beam splice (shear, moment and axial load) and all required cases are given in first page of attached document (10 different cases). Design should cover standard beam types: UB, UC, SHS and RHS. Deadline 30 days from now.

    $56568 (Avg Bid)
    $56568 Avg Bid
    22 bids

    need to deigns all missing conncetion for the steel structure ( beam to beam , beam to column , bracing , purlins , etc .... ) The loads and reaction on the joint is given and need to design the joint only

    $14833 (Avg Bid)
    $14833 Avg Bid
    28 bids

    ...electromagnetic fields for nuclear physics and quantum electrodynamics research. At ELI-NP two ten petawatt high-power laser systems together with a very brilliant narrow-width γ beam are the main research tools. Here the current status of the project and the experimental program related to nuclear research, which is under preparation at ELI-NP, are presented

    $85355 (Avg Bid)
    $85355 Avg Bid
    45 bids

    Need to design a 2 storey building in STADD Pro. Need to provide beam, slab and column detailing in AUTOCAD. Need to provide front elevation drawing. Need to provide detail estimation of the same.

    $1154 - $2885
    $1154 - $2885
    0 bids