In Progress

Calendar Game

Choose your clown

The designer will design three clown faces. The user will choose one that will be their character for the game.

The game itself will feature a large 31 day calendar with days numbered and days of the week indicated. At the top of the screen, a randomly generated question will appear. The user has to click on the day on the calendar that is the correct answer. See questions below.

If correct, clown blows his horn and the happy clown face that the user chose will appear on the day.

if wrong, a frowning face of the clown would appear on the wrong day - with the message "bad clown" at the top of the page

The game is scored like this:

User scores ten points for every correct answer and loses 20 points for every wrong answer. The game should also have a timer. For every wrong answer, five seconds should be added to the end score.

If the user gets every answer correct, he or she should be able to print out a certificate at the end of the game stating that they are a certified calendar clown, at which point they can enter their name to appear on the certificate. The certificate should be colorful and should include the image of their chosen clown.

Design needs to be colorful ad kid-friendly.

Questions included in detalied summary

## Deliverables

Questions

1st - Three days before the 4th.

2nd - a week before the 9th.

3rd - second odd day of the month

4th - second even day of the month

5th - Two weeks before the 19th

6th - 6 days before the 12th

7th - Eleven days before the 18th

8th - Sixteen days before the 24th

9th - A week and two days before the 18th

10th - Two weeks before the 24th

11th - A week after the 4th

12th - Fifteen days before the 27th

13th - Six days after the 7th

14th - A week and four days before the 25th

15th - A fortnight after the the 1st

16th - Two weeks before the 30th

17th - Five days after the 12th

18th - Eight days before the 26th

19th - The day before the 20th

20th - Two weeks after the 6th

21st - Four days after the 17th

22nd - Eleven days after the 11th

23rd - Three weeks after the2nd

24th - Five days before he 29th

25th - Three weeks and two days after the 2nd

26th - Five days before the 31st

27th - Nineteen days after the 8th

28th - Thirteen days after the 15th

29th - Twenty five days after the 4th

30th - Three weeks after the 9th

31st - Thirteen days after the 18th

Skills: ActionScript, Adobe Flash, Engineering, MySQL, PHP, Project Management, Software Architecture, Software Testing, Web Hosting, Website Management, Website Testing

See more: ten second, happy faces, even calendar, character designer game, horn, game for kid, clown, calendar print, loses, game days, odd design, image game, questions answer game, question answer image question, kid friendly, score point, 30th design, face feature, 17th, 25th design, image question answer, end day summary, 8th page, image php calendar, point click game

About the Employer:
( 118 reviews ) Sterling, United States

Project ID: #3285944

Awarded to:

xtndesign

See private message.

$255 USD in 5 days
(115 Reviews)
6.4

9 freelancers are bidding on average $216 for this job

MuktoSoftware

See private message.

$255 USD in 5 days
(447 Reviews)
7.5
losgambias

See private message.

$340 USD in 5 days
(46 Reviews)
6.5
wintechsoftsl

See private message.

$272 USD in 5 days
(27 Reviews)
5.7
rJavier

See private message.

$187 USD in 5 days
(35 Reviews)
5.6
digitalspecks

See private message.

$127.5 USD in 5 days
(20 Reviews)
5.6
bondarenco

See private message.

$340 USD in 5 days
(7 Reviews)
4.1
spidersstudi0

See private message.

$85 USD in 5 days
(9 Reviews)
3.2
NaveedXVO

See private message.

$85 USD in 5 days
(6 Reviews)
1.9