Alterative solution required to meet the BCA - 3.4.1 Report

Closed Posted Mar 18, 2013 Paid on delivery
Closed Paid on delivery

Alterative solution required to meet the BCA - 3.4.1 subventalation

Example of the alternative solution for celling heights attached but now I need one for subventalation done.

The following works have been done in the property as per attachment.

The job will be awarded within 24hours and expected report to start straight away and submit with in 48hours.

Must be accredit certifier to do this work.

The job is located in 39 Brown Street newtown can you can find all the details from the example attached already done by another certifier for the same job.

Photos can be attached of the existing vents installed. The location of them have been attached.

Must be Australia base and you can contact me 0414 668 240

This work is very urgent so no time wasters.

Files Attached.

Example attached "alterative example" for the same development done by another certifier

Attached is photos and report done by the company so this can be used as reference when composing the "alterative solution report"

Example

Building Architecture Engineering Project Management Structural Engineering

Project ID: #4343351

About the project

4 proposals Remote project Active Apr 24, 2013

4 freelancers are bidding on average $1319 for this job

DianaMJ

Hello, No attachment found. Thanks..

$2000 AUD in 25 days
(0 Reviews)
0.0
kushtian

An Experienced professional of engineering and management background. However, honestly, I am not Aussie based. Arafat

$750 AUD in 2 days
(0 Reviews)
0.0
mark30bh

I can do this job well with mech'l. vent and airflow diagram

$1400 AUD in 5 days
(0 Reviews)
0.0